Preparing For Level 3 IFE Exam Passive Fire Protection Course
by Ben Freeman | Jan 30, 2021
Preparing for level 3 IFE Exam passive fire protection course.
| Unit 1 |
What is fire? |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Human Behaviour / Why are you here? / You and Your Work |
|
| Unit 4 |
Assessment |
|
| Unit 5 |
Building Regulations |
|
| Unit 6 |
Assessment |
|
| Unit 7 |
The Regulatory Reform Fire Safety Order 2005 |
|
| Unit 8 |
Assessment |
|
| Unit 9 |
Study-Prosecutions / Other Relevant Fire Safety Legislations |
|
| Unit 10 |
Assessment |
|
| Unit 11 |
Equivalent Regulations and Legislations / Product and Installer 3rd Party Certification |
|
| Unit 12 |
Assessment |
|
| Unit 13 |
Passive and Active Systems |
|
| Unit 14 |
Assessment |
|
| Unit 15 |
European Requirements / Fire Testing / The Performance Criterion / Large Scale Test – Structural Elements / Section Factor |
|
| Unit 16 |
Assessment |
|
| Unit 17 |
Fire Testing – Fire-Rated Ductwork / Other Tests: Miscellaneous |
|
| Unit 18 |
Assessment |
|
| Unit 19 |
European Fire Testing |
|
| Unit 20 |
Assessment |
|
| Unit 21 |
The Impact of Fires |
|
| Unit 22 |
Assessment |
|
| Unit 1 |
Introduction / Building Regulations |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Fire Testing of Penetration Sealing Systems and Linear Gap Seals / Fire Testing of Cavity Barriers |
|
| Unit 4 |
Assessment |
|
| Unit 5 |
The 6 Step Process to Installation (Products) / Step 1 The Supporting Construction |
|
| Unit 6 |
Assessment |
|
| Unit 7 |
Step 2 Safe Access / Step 3 The Services / Step 4 The Size / Step 5 The Specification / Bags and Pillows / Pre-Formed Elastomeric Seals |
|
| Unit 8 |
Assessment |
|
| Unit 9 |
Cavity Barriers / Semi-Rigid Barriers / Rigid Barriers |
|
| Unit 10 |
Assessment |
|
| Unit 11 |
Step 6 The Installation Specification |
|
| Unit 12 |
Assessment |
|
| Unit 13 |
Fixing of Mineral Wool Cavity Barriers / Fixing of Glass Cloth Barriers |
|
| Unit 14 |
Assessment |
|
| Unit 15 |
Maintenance / Quality Records |
|
| Unit 16 |
Assessment |
|
| Unit 1 |
Introduction / Building Regulations |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Fire Testing / Performance Criteria / Smoke Extraction Systems |
|
| Unit 4 |
Assessment |
|
| Unit 5 |
Synopsis of Duct Systems / Ductwork Design / Fire Resisting Ductwork / Types of Dampers |
|
| Unit 6 |
Assessment |
|
| Unit 7 |
Fire Resisting Enclosures / Intumescent Fire Dampers / Insulated Dampers / Damper Installation - Supporting Construction / Ancillary Equipment |
|
| Unit 8 |
Assessment |
|
| Unit 9 |
Damper Operation / Damper Design / In-Line Dampers / Out-of-Line Dampers |
|
| Unit 10 |
Assessment |
|
| Unit 11 |
Penetration Sealing Systems / Health and Safety / Pre-Handover Checks / Storage, Handling and Maintenance / Quality Records |
|
| Unit 12 |
Assessment |
|
| Unit 1 |
Introduction / The Building Regulations / Fire Testing of Fire Doorsets and Glazed Screens / Reaction to Fire Testing of Doorsets and Glazed Screens |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Doorset Installation / Glass Installation |
|
| Unit 4 |
Assessment |
|
| Unit 5 |
Maintenance of Doorsets and Screens |
|
| Unit 6 |
Assessment |
|
| Unit 1 |
The Life Cycle of Structural Steel / The Fire Resistance Test / Fire Testing of Structural Members |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Manufacturer’s Information / Section Factor / Composite and Non-Composite Beams / Castellated Sections and Others / Junctions Between Different Fire Protection Systems / Refurbishment and Upgrading of Fire Protection of Structural Steelwork |
|
| Unit 4 |
Assessment |
|
| Unit 1 |
Introduction / Intumescent Products / Properties of Intumescent Coatings / Manufacturer’s Information / Fire Testing of Intumescent Systems / The Coating System / Off-Site Applied Thin Film Intumescent Coatings |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Quality Control / Health and Safety |
|
| Unit 4 |
Assessment |
|
| Unit 1 |
Introduction / Board Types / Fixing Methods |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Installation Checklist / Prefabricated Steel Encasement / Column – Beam Intersection / Quality Control / Health and Safety |
|
| Unit 4 |
Assessment |
|
| Unit 1 |
Introduction / The Fire Resistance Test and Product Types / Fire Resistance Testing / Manufacturer’s Information / Pre-Application Considerations / Application of the Sprayed Fire Resisting Material / Quality Control / Repairs and Patching / Health and Safety / Storage and Transportation / Timber Frames |
|
| Unit 2 |
Assessment |
|
| Unit 1 |
Examination Module |
|
| Unit 1 |
What is fire? |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Human Behaviour / Why are you here? / You and Your Work |
|
| Unit 4 |
Assessment |
|
| Unit 5 |
Building Regulations |
|
| Unit 6 |
Assessment |
|
| Unit 7 |
The Regulatory Reform Fire Safety Order 2005 |
|
| Unit 8 |
Assessment |
|
| Unit 9 |
Study-Prosecutions / Other Relevant Fire Safety Legislations |
|
| Unit 10 |
Assessment |
|
| Unit 11 |
Equivalent Regulations and Legislations / Product and Installer 3rd Party Certification |
|
| Unit 12 |
Assessment |
|
| Unit 13 |
Passive and Active Systems |
|
| Unit 14 |
Assessment |
|
| Unit 15 |
European Requirements / Fire Testing / The Performance Criterion / Large Scale Test – Structural Elements / Section Factor |
|
| Unit 16 |
Assessment |
|
| Unit 17 |
Fire Testing – Fire-Rated Ductwork / Other Tests: Miscellaneous |
|
| Unit 18 |
Assessment |
|
| Unit 19 |
European Fire Testing |
|
| Unit 20 |
Assessment |
|
| Unit 21 |
The Impact of Fires |
|
| Unit 22 |
Assessment |
|
| Unit 1 |
Introduction / Building Regulations |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Fire Testing of Penetration Sealing Systems and Linear Gap Seals / Fire Testing of Cavity Barriers |
|
| Unit 4 |
Assessment |
|
| Unit 5 |
The 6 Step Process to Installation (Products) / Step 1 The Supporting Construction |
|
| Unit 6 |
Assessment |
|
| Unit 7 |
Step 2 Safe Access / Step 3 The Services / Step 4 The Size / Step 5 The Specification / Bags and Pillows / Pre-Formed Elastomeric Seals |
|
| Unit 8 |
Assessment |
|
| Unit 9 |
Cavity Barriers / Semi-Rigid Barriers / Rigid Barriers |
|
| Unit 10 |
Assessment |
|
| Unit 11 |
Step 6 The Installation Specification |
|
| Unit 12 |
Assessment |
|
| Unit 13 |
Fixing of Mineral Wool Cavity Barriers / Fixing of Glass Cloth Barriers |
|
| Unit 14 |
Assessment |
|
| Unit 15 |
Maintenance / Quality Records |
|
| Unit 16 |
Assessment |
|
| Unit 1 |
Introduction / Building Regulations |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Fire Testing / Performance Criteria / Smoke Extraction Systems |
|
| Unit 4 |
Assessment |
|
| Unit 5 |
Synopsis of Duct Systems / Ductwork Design / Fire Resisting Ductwork / Types of Dampers |
|
| Unit 6 |
Assessment |
|
| Unit 7 |
Fire Resisting Enclosures / Intumescent Fire Dampers / Insulated Dampers / Damper Installation - Supporting Construction / Ancillary Equipment |
|
| Unit 8 |
Assessment |
|
| Unit 9 |
Damper Operation / Damper Design / In-Line Dampers / Out-of-Line Dampers |
|
| Unit 10 |
Assessment |
|
| Unit 11 |
Penetration Sealing Systems / Health and Safety / Pre-Handover Checks / Storage, Handling and Maintenance / Quality Records |
|
| Unit 12 |
Assessment |
|
| Unit 1 |
Introduction / The Building Regulations / Fire Testing of Fire Doorsets and Glazed Screens / Reaction to Fire Testing of Doorsets and Glazed Screens |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Doorset Installation / Glass Installation |
|
| Unit 4 |
Assessment |
|
| Unit 5 |
Maintenance of Doorsets and Screens |
|
| Unit 6 |
Assessment |
|
| Unit 1 |
The Life Cycle of Structural Steel / The Fire Resistance Test / Fire Testing of Structural Members |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Manufacturer’s Information / Section Factor / Composite and Non-Composite Beams / Castellated Sections and Others / Junctions Between Different Fire Protection Systems / Refurbishment and Upgrading of Fire Protection of Structural Steelwork |
|
| Unit 4 |
Assessment |
|
| Unit 1 |
Introduction / Intumescent Products / Properties of Intumescent Coatings / Manufacturer’s Information / Fire Testing of Intumescent Systems / The Coating System / Off-Site Applied Thin Film Intumescent Coatings |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Quality Control / Health and Safety |
|
| Unit 4 |
Assessment |
|
| Unit 1 |
Introduction / Board Types / Fixing Methods |
|
| Unit 2 |
Assessment |
|
| Unit 3 |
Installation Checklist / Prefabricated Steel Encasement / Column – Beam Intersection / Quality Control / Health and Safety |
|
| Unit 4 |
Assessment |
|
| Unit 1 |
Introduction / The Fire Resistance Test and Product Types / Fire Resistance Testing / Manufacturer’s Information / Pre-Application Considerations / Application of the Sprayed Fire Resisting Material / Quality Control / Repairs and Patching / Health and Safety / Storage and Transportation / Timber Frames |
|
| Unit 2 |
Assessment |
|
| Unit 1 |
Examination Module |
|
Recent Comments